Definition of Done (DoD) in SDLC

Jan 22, 2024

17 Min Read

1. What is the definition of done (DoD) in the software development life cycle (SDLC)?

The definition of done (DoD) in the software development life cycle (SDLC) is a set of criteria or requirements that must be fulfilled before a particular feature, user story, task, or project can be considered completed. It serves as a shared understanding between the development team and stakeholders of what needs to be delivered and how success will be measured. The DoD typically includes technical, functional, and quality standards that need to be met for the software to be considered complete and ready for production.

2. Why is having a clear definition of done important in software development?
Having a clear definition of done is important in software development for several reasons:

a) Setting expectations: The DoD helps to set clear expectations between the development team, stakeholders, and customers on what will be delivered at the end of each development cycle.

b) Avoiding misunderstandings: By clearly defining what constitutes a completed feature or project, misunderstandings and miscommunications can be avoided. This ensures that all parties involved are on the same page and have a shared understanding of what is expected.

c) Improvement of quality: A well-defined DoD includes quality standards that must be met before a feature is considered complete. This helps to ensure that high-quality work is produced consistently.

d) Facilitating continuous improvement: With a clearly defined DoD, the development team can continuously improve their processes and practices by identifying any gaps or areas for improvement in meeting the defined criteria.

e) Meeting business objectives: The DoD serves as a measure of success for each delivery iteration, ensuring that business objectives are being met effectively.

f) Preventing scope creep: With an established DoD, there is less room for scope creep as all stakeholders are aware of what has been agreed upon as completed work. This helps to keep projects on track within their defined budget and timeline.

2. Why is it important to have a clear definition of done in SDLC?


1. Helps to set expectations: A clear definition of done provides a shared understanding and agreement of what is expected from the project team at the end of each phase or iteration. This helps to avoid miscommunication and ensures that everyone is working towards the same goal.

2. Facilitates planning and prioritization: A clear definition of done allows for more accurate planning and resource allocation as the team knows exactly what needs to be accomplished before moving on to the next phase or task. It also helps in prioritizing tasks based on their level of completion.

3. Ensures completeness: Having a clear definition of done ensures that all necessary tasks and requirements have been completed before moving on to the next stage. This minimizes the risk of missing crucial steps or features, which could result in delays or lower quality deliverables.

4. Improves efficiency: When team members know exactly what is required for a task to be considered complete, they can focus on meeting those specific criteria rather than spending unnecessary time on additional work that may not be required.

5. Better quality control: A clear definition of done serves as a guideline for quality assurance processes, making it easier to validate whether all requirements have been met and ensuring a higher-quality end product.

6. Reduces rework: With a clear definition of done, stakeholders are able to provide feedback earlier in the development process, reducing the need for extensive revisions or rework in later stages.

7. Helps with project management: Defining what constitutes as “done” at each stage allows project managers to monitor progress more effectively and adjust timelines if necessary.

8. Increases transparency and accountability: When everyone understands what needs to be done, it promotes transparency within the team and creates accountability for each team member’s role in achieving project goals.

9. Defines acceptance criteria: Incorporating acceptance criteria into the definition of done ensures that client requirements are being met and allows for more effective communication between the development team and stakeholders.

10. Helps with continuous improvement: A clear definition of done allows for continuous improvement by providing a baseline for evaluating the success of each project phase and identifying areas for improvement in future projects.

3. Who is responsible for defining the DoD in software development?


The Department of Defense (DoD) is responsible for defining software development within the military. This includes setting guidelines, standards, and policies for software development processes and systems used by the various branches of the military.

4. How does having a defined DoD improve collaboration and communication within a team?


Having a defined DoD (Definition of Done) improves collaboration and communication within a team in several ways:

1. Clear understanding of expectations: Having a well-defined DoD helps team members understand what is expected from them at the end of each sprint or iteration. This clarity ensures that all team members are on the same page and working towards a common goal.

2. Shared responsibility: By agreeing on a set of criteria that must be met for a user story to be considered “done,” team members share the responsibility of delivering high-quality work. This encourages everyone to work together and collaborate to achieve the goals outlined in the DoD.

3. Fosters transparency: A defined DoD promotes transparency within the team by setting clear guidelines for completing tasks. This allows team members to have an open discussion about what’s required for each user story, identify any potential roadblocks, and come up with solutions collaboratively.

4. Encourages early feedback: With a clearly defined DoD, team members are encouraged to seek feedback from other team members early on in the development process. This enables issues or bugs to be addressed promptly, leading to fewer delays and setbacks down the line.

5. Facilitates effective communication: The existence of a well-defined DoD encourages effective communication among team members as it provides a common language for discussing work progress and identifying any gaps or potential issues that need attention.

6. Improves time management: When all team members have a clear understanding of what constitutes “done,” they can more effectively manage their time during sprints or iterations, ensuring they meet all necessary criteria before moving on to the next task.

Overall, having a defined DoD promotes collaboration, transparency, accountability, and improved time management within a team – all essential elements for successful project delivery.

5. What are some common criteria included in a DoD?

6. Can the DoD vary between different stages of the SDLC?


Yes, the DoD can vary between different stages of the SDLC (Software Development Life Cycle). This document outlines the minimum requirements and criteria that must be met at each stage of the SDLC. However, some projects may have different needs or circumstances that require additional requirements to be included in the DoD at certain stages.

For example, during the planning and design phase, the DoD may focus on ensuring that all project requirements have been identified and documented. In contrast, during the testing and deployment phase, the DoD may focus on ensuring that all identified bugs and issues have been addressed before release.

Ultimately, the specifics of how the DoD is applied at each stage of the SDLC will depend on factors such as project size, complexity, and timeline. The key is that throughout all stages of the SDLC, a set of clear and defined criteria must be met for a software product to progress to the next stage or to be considered complete.

7. How does a clear definition of done help with project planning and estimating timelines?


A clear definition of done helps with project planning and estimating timelines in several ways:

1. Clarity on project scope: Defining what constitutes as “done” for each task or deliverable helps identify the specific requirements and expectations for the project. This clarity makes it easier to define the tasks, prioritize them, and create a realistic timeline based on the effort required to complete each task.

2. Avoiding rework: A defined definition of done includes all elements required for a task to be considered completed. It minimizes the chances of missing any crucial aspects that may arise during the project’s execution and cause rework, which can delay timelines and increase costs.

3. Setting expectations: When everyone involved in the project knows what is expected from them to consider a task as complete, it prevents misunderstandings and confusion later on. This understanding ensures that team members work towards a common goal and complete their tasks within the set timeline.

4. More accurate estimations: With a clear definition of done, team members develop a shared understanding of what needs to be accomplished, making it easier for them to provide realistic time estimates for completing each task. It also allows for more efficient resource allocation and better integration with other tasks, improving overall time estimates.

5. Facilitating progress tracking: Having a clear definition of what constitutes completion allows for easier tracking of progress against established milestones or deadlines. If a finished task meets all criteria listed in the definition of done, it can be marked as completed, providing an accurate picture of where the project stands at any given time.

Overall, a well-defined definition of done eliminates ambiguities in project planning and provides clarity into how long each task takes to complete accurately. This understanding helps teams meet deadlines consistently while delivering high-quality work within budget constraints.

8. Is it necessary for the DoD to be agreed upon by all team members?

+
+No, it is not necessary for the DoD to be agreed upon by all team members. However, in order for it to be effective, it should at least be understood and accepted by all team members. It is important for the DoD to be clearly communicated and agreed upon by the majority of the team in order for it to be properly implemented and followed.

9. Are there any industry standards or guidelines for creating a DoD?


Yes, there are several industry standards and guidelines for creating a DoD. These include:

1. Agile Manifesto: This set of principles outlines the values and objectives of the agile software development approach, including the importance of delivering working software incrementally and continuously.

2. Scrum Guide: The Scrum Guide is a framework for implementing Agile methodology in software development projects. It provides guidance on roles, events, artifacts, and rules that support the delivery of high-quality products.

3. Lean Software Development Principles: Developed by Mary and Tom Poppendieck, these principles focus on creating value for the customer, eliminating waste, empowering teams, building quality in from the start, optimizing the whole system, delivering fast, and continually improving.

4. XP (Extreme Programming) Practices: XP is an Agile software development methodology that focuses on delivering high-quality software quickly through practices such as test-driven development (TDD), pair programming, continuous integration, refactoring code, and regular communication with customers.

5. Definition of Ready (DoR): This is a checklist or set of criteria that outlines what needs to be completed before a user story or requirement can be considered ready to be worked on by a team.

6. Definition of Done (DoD): The DoD outlines the agreed-upon criteria that must be met for a user story or requirement to be considered complete and “done” by the development team.

7. IEEE 829 Standard for Software Test Documentation: This standard provides guidelines for creating test plans, test descriptions/specifications, defect reports, test logs/results/reports/summaries/cases/scenarios/, incident reports/scripts/procedures log/count summary/report/rate history/graphs/charts/diagrams/maps/spread sheets/list/matrix/number/files/formats/templates/, verification summaries/reviews/witness data or evidence from peer reviews/walking through/steps/investigations/interviews/audits relating or related to requirement/design/code/part/element/module/component/system/subsystem/context-main/sub-context/unit/data for system and acceptance tests, status reporting, test incident report categories/severity levels/priorities/, script key words/definitions/templates/glossary, data consistency checks/compiling

8. ISO/IEC/IEEE 29119 Software Testing Standard: This standard provides a comprehensive overview of the software testing process and includes guidelines for test planning, execution, evaluation, and closure.

9. PMBOK® Guide: The Project Management Body of Knowledge (PMBOK® Guide) published by the Project Management Institute provides a detailed framework for project management best practices, including project initiation, planning, execution, monitoring and control, and closing.

10. BABOK® Guide: The Business Analysis Body of Knowledge (BABOK® Guide) published by the International Institute of Business Analysis outlines the essential knowledge areas and tasks for business analysts in software development projects.

It is important to note that these standards and guidelines may vary depending on the specific industry or type of project being developed. It is recommended to consult with experts or experienced professionals in your specific field to determine which standards would be most appropriate for your DoD creation.

10. Can changes be made to the DoD during the course of a project?


Yes, changes can be made to the DoD during the course of a project if necessary. These changes should be documented and communicated to all stakeholders involved. The purpose of a DoD is to set clear expectations and criteria for project deliverables, so any changes should be carefully considered and agreed upon by all relevant parties. Any updates to the DoD should also be reflected in the project plan and schedule, if applicable.

11. What are some potential consequences of not having a well-defined DoD?


1. Unclear responsibilities: Without a well-defined DoD, it can be unclear who is responsible for which tasks and deliverables. This can lead to confusion and inefficiency in completing projects.

2. Missed deadlines: When each team member is not clear on their roles and responsibilities, work may fall through the cracks and deadlines may be missed.

3. Bickering and conflict: A lack of clearly defined roles and responsibilities can lead to disagreements among team members over who should do what. This can create a negative work environment and hinder productivity.

4. Duplication of effort: Without a DoD, team members may unknowingly duplicate each other’s work, leading to wasted time and resources.

5. Lack of accountability: If no one is clearly assigned a task or responsibility, there may be no one to hold accountable if something goes wrong or is not completed on time.

6. Inefficient use of resources: In the absence of a DoD, resources such as equipment, budget, and personnel may not be allocated efficiently, leading to unnecessary costs and delays.

7. Poor communication: A lack of clarity around roles and responsibilities can result in poor communication within the team, as team members may assume others are handling certain tasks when they are not.

8. Incomplete or subpar deliverables: Without a well-defined DoD, important tasks or aspects of a project may be overlooked or deemed as someone else’s responsibility, resulting in incomplete or subpar deliverables.

9. Decreased motivation and morale: When team members are unsure about their role in a project or feel that their contributions are not valued, it can lead to decreased motivation and low morale.

10. Negative impact on project success: Ultimately, the consequences of not having a well-defined DoD can have a significant impact on the success of a project overall.

11.Missed opportunities for improvement: A well-defined DoD allows for feedback and encourages continuous improvement. Without it, potential areas for improvement may not be identified and addressed, hindering the growth and progress of the team and the project.

12. Can user acceptance testing (UAT) be considered part of the DoD?


Yes, user acceptance testing (UAT) can be considered part of the Definition of Done (DoD) if it is specified as a requirement for a task to be considered completed. The DoD includes all criteria that must be met for a product increment to be considered “done” and ready for release. This can include acceptance by the end users through UAT as a final step in the development process.

13. How does the DoD ensure that quality and customer satisfaction are met?


The DoD has several processes in place to ensure quality and customer satisfaction are met, including:

1. Quality control and inspection: The DoD has a system of quality control and inspection to identify and correct any issues or deficiencies in the products or services being provided.

2. Performance metrics: The DoD sets specific performance metrics for contractors and suppliers, which must be met in order for them to be considered reliable and high-quality providers.

3. Audits: The DoD conducts regular audits of its contractors and suppliers to assess their compliance with standards, regulations, and performance requirements.

4. Customer feedback: The DoD gathers feedback from its customers through surveys, focus groups, and other methods to identify areas for improvement and address any concerns or complaints.

5. Training and certification: Contractors and suppliers working for the DoD are required to undergo training and certification processes to demonstrate their expertise and ability to meet quality standards.

6. Communication channels: The DoD maintains open communication channels with its customers to ensure they are satisfied with the products or services being provided and can address any issues promptly.

7. Continuous improvement: The DoD encourages continuous improvement by regularly reviewing its processes, identifying areas for improvement, and implementing changes as needed.

8. Compliance with regulations: All products and services provided by the DoD must meet relevant laws, regulations, and industry standards to ensure quality and customer satisfaction are maintained.

14. Does having a detailed DoD mean that all tasks must be completed before moving onto the next stage of SDLC?


Not necessarily. A detailed DoD outlines the specific criteria that must be met for a task to be considered complete. However, the order in which tasks are completed can vary depending on the specific SDLC approach being used (e.g. waterfall vs agile). In general, it is important to have clear guidelines and checkpoints in place throughout the SDLC to ensure that each task is completed thoroughly before moving on to the next stage.

15. Is continuous testing included in the definition of done or is it separate from it?

Continuous testing is typically considered a separate practice from the definition of done. The definition of done usually refers to a set of specific criteria that must be met before a task or user story can be considered complete. This may include factors such as code review, documentation, and acceptance testing.

Continuous testing, on the other hand, refers to the ongoing process of testing throughout the development cycle. This could involve unit testing, integration testing, and regression testing to ensure that code changes do not introduce bugs or break existing functionality. While continuous testing is an important aspect of agile development and helps to facilitate meeting the definition of done, it is considered a separate activity.

16. How can automation and tools be used to support adherence to the defined DoD?


Automation and tools can be used to support adherence to the defined Definition of Done (DoD) in several ways.

1. Automated testing: By automating tests, developers and testers can quickly and accurately check if a feature meets the DoD criteria. This reduces the risk of human error and speeds up the testing process.

2. Continuous Integration (CI): CI tools can automatically build, test, and deploy code changes, ensuring that all code merged into the project meets the DoD criteria.

3. Code quality tools: These tools can analyze code for potential bugs, security vulnerabilities, and coding standards adherence. They help identify areas that need to be improved before a feature is considered complete according to the DoD.

4. Static code analysis: This type of tool checks code for potential issues without actually executing it. This can also help catch problems early on in the development process, reducing rework and ensuring adherence to quality standards set out in the DoD.

5. Documentation automation: Tools such as documentation generators or automated document formatting ensure that all necessary documentation is created in line with the DoD criteria.

6. Tracking and reporting tools: These tools provide real-time visibility into progress towards meeting DoD criteria, allowing teams to identify areas that may require additional attention.

7. Test case management tools: These can help teams keep track of different testing scenarios and ensure that all aspects of the DoD are being tested thoroughly.

Overall, automation and tools help improve efficiency in meeting DoD criteria by reducing manual processes, catching errors early on, providing visibility into progress, and promoting consistent implementation of best practices. Teams should choose their automation and tooling based on their unique needs and processes to fully leverage their benefits in supporting adherence to DoD standards.

17. What role does peer review play in ensuring adherence to the DoD?


Peer review is an important step in the DoD process for ensuring adherence to ethical principles and sound judgment. Through peer review, experts and colleagues in a particular field evaluate and critique proposed plans, decisions, or actions to ensure that they align with established standards and guidelines. This helps to identify potential ethical concerns or conflicts of interest and allows for adjustments or changes to be made before a final decision is reached.

Peer review also helps to promote transparency and accountability within the DoD, as it provides a way for individuals outside of immediate decision-making roles to voice their concerns and provide constructive feedback. This can ultimately lead to better-informed decisions that are more likely to adhere to ethical standards.

In addition, peer review can also serve as a checks-and-balances mechanism within the DoD by providing an independent evaluation of proposed plans or actions. This can help prevent any one individual or group from making unethical or biased decisions.

Overall, peer review plays a crucial role in ensuring that the DoD operates ethically and with integrity by promoting transparency, accountability, and informed decision-making.

18. What steps should be taken if there are disagreements about whether something meets the defined criteria in the DoD?


1. Clearly communicate the criteria: The first step in resolving any disagreement about DoD criteria is to ensure that all parties involved have a clear understanding of the defined criteria. This can be achieved by giving a thorough explanation of the criteria, providing examples, and answering any questions or concerns.

2. Gather all necessary information: It is important to gather all relevant information related to the issue at hand. This may include previous decisions or judgments made, documentation, data, and expert opinions.

3. Hold discussions and meetings: Encourage open and honest discussions between all parties involved to express their viewpoints. Through these discussions, it may become clear where the disagreements lie and potential solutions can be proposed.

4. Seek advice from experts: If necessary, seek advice from subject matter experts or other individuals who have expertise in the specific area of disagreement. Their insights and recommendations can help reach a resolution.

5. Use third-party mediation: In some cases, it may be helpful to involve a neutral third party to mediate the disagreement. A mediator can facilitate communication between conflicting parties and help find common ground for a resolution.

6. Consider alternate perspectives: It is important to consider alternate perspectives on the issue at hand, especially if there are multiple stakeholders involved. This can provide a more well-rounded view and help identify potential solutions that may not have been considered initially.

7. Document decisions and rationale: Once a decision has been reached, document the rationale behind it in detail. This will help prevent similar disagreements from arising in the future and provide clarity on how decisions were made.

8. Review periodically: The DoD should be periodically reviewed to ensure that it is still relevant and effective in achieving its intended purpose. Any changes or updates should be communicated clearly to all stakeholders involved.

19.Could you provide an example scenario where lack of clarity on what’s considered ‘done’ could cause issues within a project?


Sure, here’s an example scenario:

The project manager of a software development team is working on a new feature for their product. The development team has completed the coding and testing for the feature, and they present it to the project manager as being “done”. However, when the project manager reviews it, they realize that important documentation and user acceptance testing (UAT) are missing.

As per their understanding, “done” means that all aspects of the feature have been completed including coding, testing, documentation, and UAT. But the development team argues that they only consider something as “done” once it has passed all necessary code tests.

This lack of clarity on what constitutes “done” results in confusion and delays in delivering the feature to users. The project manager needs to explain to the client why there will be a delay in releasing the feature, leading to dissatisfaction and potential loss of business. Additionally, without proper documentation or UAT, the feature may not function as expected or may have bugs that could cause issues for users.

Furthermore, this lack of clarity also causes tension between the project manager and the development team. The project manager believes that they had communicated their expectations clearly, while the development team feels like they did what was asked of them.

In this situation, if there had been a clear definition of “done”, with all stakeholders agreeing upon it beforehand, these issues could have been avoided. Clearly defined criteria for what’s considered “done” would have ensured that all teams are aligned on expectations and deliverables. It would have also helped set realistic timelines for different tasks involved in completing a project accurately.

20.How frequently should teams revisit and potentially revise their definition of done throughout a project?


Teams should revisit and potentially revise their definition of done at the end of each sprint or iteration. This allows them to reflect on their progress and make necessary updates to the definition of done based on any changes in project requirements or team capabilities. Additionally, the definition of done should be continuously reviewed and refined throughout the project as new information or insights are gained. This will ensure that the team is consistently working towards a clear and achievable goal.